Supporting Infrastructure in Geothermal Drilling Project – Wellpad Preparation
Before the drilling operation phase, the geothermal developer needs to prepare the wellpad area. The area should be designed and constructed at least to:
(a) Support all drilling equipments loads;
(b) Control run-off and contain drilling fluids;
(c) Review the geotechnical assessment during site preparation and carry out additional remedial work as required;
(d) Consider consolidation grouting, where subsurface conditions warrant; and
(e) Have finished grades in the site area covered by the drilling rig
PT Rigsis Energi Indonesia proudly presents our 13th webinar “Supporting Infrastructure in Geothermal Drilling Project: Wellpad Preparation” with Mr. Agus Soedarsa as the speaker.